Skip to content
Monday – Friday: 7:00 am – 5:00 pm · Saturday – Sunday: ClosedMonday – Friday: 7:00 am – 5:00 pmMaster Electrician · CO Lic. 000000Verify(970) 555-0100

New circuits

Room for a heat pump, EV charger or ADU

One new 240-volt circuit, or a subpanel, depending on what your panel can carry.

The load check comes first. It tells us whether the panel has room for one more big circuit, needs a subpanel, or needs a bigger service. You get that answer in writing before we price any of it.

Service disconnects bolted to a rack against a brick wall, with conduit running down to the ground

Which one

Three answers the load check can give

  • The panel has room

    One dedicated circuit runs from a spare breaker space to the charger or heat pump.

    See what it includes
  • The panel is full but the service is fine

    A subpanel adds breaker spaces, fed from the main panel.

    See what it includes
  • The service is the limit

    A bigger service comes first, then the new circuits.

    Read about service upgrades

Pricing

What new circuits include

  • Load check and quote visit

    We measure what your house draws, open the panel, check the meter base and grounding, and write the quote. Book the work within 30 days and the visit fee comes off.

    • Load calculation for your whole house
    • Panel, meter base and grounding inspected
    • Written quote with permit and utility steps
    • Repairs on the day
    Term:
    Credited to the job
  • 240-volt circuit for an EV charger or heat pump

    One dedicated circuit from the panel to the charger or disconnect, when the load check says the panel has room.

    • Breaker, wire and receptacle or disconnect
    • A run of up to 40 feet from the panel
    • Permit and inspection fees
    • The charger or equipment
    • A panel upgrade, if the load check calls for one
    Term:
    Installed

    A longer run or a finished wall adds to it.

  • Subpanel for a heat pump, EV charger or ADU

    Room for new loads without overloading the main panel, sized from your load check.

    • Subpanel and feeder from the main panel
    • Permit and inspection fees
    • Circuits labeled at both panels
    • The heat pump, charger or appliance itself
    • Trenching to a detached garage or ADU
    Term:
    Installed

    A garage or ADU across the yard adds trenching and conduit.

Priced for a standard house, before sales tax. A charger or heat pump is bought separately.

New circuits, answered

Do I need a bigger panel for an EV charger or heat pump?

It depends on the load check. Many houses can take one new 240-volt circuit. Two or three big loads together, such as a heat pump, a charger and an induction range, often need a larger service. We run the numbers before we quote and put the result in writing.

Do I need a permit, and who pulls it?

Panel and service work needs a permit from your city or town and an inspection before the power goes back on. We apply for it, and its fee is a separate line on your quote. Rules differ from one city to the next, so we tell you what yours asks for.

What does the visit cost, and is it credited?

The load check and quote visit has a set fee, quoted when you book. Book the work within 30 days and the fee comes off the job. If you don't, it covers the time we spent measuring your house and writing the quote.

Tell us what is going in

Name the heat pump, charger or ADU, and text a photo of the panel. We'll book the load check.